2 X Structure Hook-Up preparating (IOORS/SS7)


Working Conditions

  • Start date May 2018
  • Duration 6 Months
  • Client SUBSEA 7
  • Project Multiple Projects
  • Location To be confirmed by Client
  • Country Nigeria
  • Posted on 03/05/2018
  • Rotation Scheme Onshore 10 x 3 / Offshore 5 x 5 or 4 x 4
  • Reference IOORS/SS7

Main Roles and Responsibilities

  • Familiar with definition and design of Structure.
  • Familiar with Installation Engineering
  • Provide Excel skills and knowledge; and basic knowledge in Autocad 2D and Access.
  • English is mandatory

Important Information

  • All information about the job opportunity (including main roles and responsibility) serves in general, as an indication only. The client shall reserve the right to change / modify the information
  • All the requirements are mandatory unless it is described otherwise.
  • Only shortlisted potential candidates will be notified and contacted by IOORS.
  • IOORS will keep your information in our database for more suitable positions in the future.

Share this: